3.5RL V6-3474cc 3.5L (2001)
Shift Solenoid: Testing and Inspection
Shift Solenoid Valves A and B (1)
Test
1. Disconnect the transmission sub-harness connector (14P).
2. Measure the resistance between the No. 4 terminal of the transmission sub-harness connector and body ground, and between the No. 5 terminal
and body ground.
STANDARD: 12 - 25 Ohms
3. If the resistance is out of specification, remove the shift cable cover, and disconnect the shift solenoid valve/A/T clutch pressure control solenoid
valve harness connector.