Integra (RS, LS) L4-1834cc 1.8L DOHC PFI (1995)
Condenser Fan Motor Relay: Testing and Inspection
Relay Test
There should be continuity between the A and C terminals when power and ground are connected to the B and D terminals.
There should be no continuitv when power is disconnected.