TL V6-3.5L (2007)
8. Weld the wheel house upper member (A).
Damper Housing
1. Set the new parts, and front bulkhead into position, and measure the front compartment diagonally. Check the body dimensions, engine
compartment, engine compartment and front floor under view, repair chart top view, repair chart side view.
2. Tack weld the new parts into position.
3. Temporarily install the front sub frame, and check the front side frame position.
4. Temporarily install the hood, front fender, headlight, and front bumper, then check for differences in level and clearance. Make sure the body lines
flow smoothly.