audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Evaporative Emission Control Canister > < Vehicles Produced Up to November 1988
Page 1
background image

Canister Purge Solenoid: Testing and Inspection
Vehicles Produced From November 1988

CIS-E III Control Unit Harness Connectors (Pin # Locations)

 

1.

Perform self diagnostic output check, call up output code 4343.

-

Carbon canister shut-off valve should click on and off when full throttle switch is closed. If it does, valve is OK. If not, continue with test.

 

2.

Disconnect electrical connector at valve, and connect LED test light between the two terminals on harness side of connector.

-

LED should flash when connected with proper polarity. If LED flashes but valve did not operate, replace valve. If LED does not flash, check
for:
a.

Open or grounded circuit between shut-off valve harness connector terminal #2 (Red wire) and fuel control unit terminal #15.

b.

Open or grounded circuit between shut-off valve harness connector terminal #1 (G/R wire) and fuse #28 in fuse relay panel.

 
If no wiring problems are found and LED still does not flash, fuel control unit is faulty.
 

Evaporative Emission Control Canister > < Vehicles Produced Up to November 1988