Install and connect indicator light as follows:
-
mark and drill a 9 mm hole 25 mm from left edge of dashboard and 25 mm from bottom edge of dashboard in location shown by arrow
-
connect both yellow and white wires to indicator light and route to control unit
-
connect white wire to one male terminal of double connector on terminal 15 of control unit
-
connect yellow wire to terminal 31b of control unit
-
connect black wire (included in Kit) to remaining male terminal of double connector on terminal 15 of control unit
-
route wire to bottom of Fuse/Relay Panel
-
locate short red lead which runs from white, 3 point, multi-point connector on bottom of Fuse/Relay Panel to white, single-point connector about 6
in. below Fuse/Relay Panel
-
splice black wire to red wire with a "Scotchlock" connector
-
connect brown wire (included in Kit) to terminal 31 of control unit and to ground cluster under dash
-
reinstall left side underdash storage panel and heater duct
-
reconnect battery ground cable
-
test system by switching ignition on and grounding blue wire from sensor on fuel filter casing. Light should come on and remain on until ignition is
switched off
Labor Operation:
20 34 31 0
Time Allowance:
75 T.U.