90S Quattro (Canada) V6-2.8L (AAH) (1993)
- Pull rear guides with cables out of tubular guides.
Installing:
- Clean guide rails and tubular guides
- Lightly oil cables of rear guides.
- Check tubular guide brackets for damage.
CAUTION! The front guide is "automatically" offset and pretensioned when installed and, as a result, one end of the guide rail is higher. Under no
circumstances should this be adjusted!
- Mount water drain plate on guide plate.
Water drain plate must first be engaged in guide rails on left and right sides.
- Assemble subassembly and insert phasing for sunroof into guide rails.
- Install subassembly.
- Adjust parallel running of rear guides and roof panel.
- Check "Neutral" position of cable drive; adjust if necessary.