audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Timing Belt - Removal and Installation Procedure|Page 703 > < Valve Clearance|Specifications|Page 698
Page 1
background image

Toothed Belt: Technical Service Bulletins
Timing Belt - Removal and Installation Procedure

Group: 13
Number: 92-03
Date: December 31, 1992

Subject:
Toothed Belt, Removing and Installing

Model(s): 
100
1992 m.y.

Canada 1993 m.y.

Supersedes T.B. 13-92-01 of June 30, 1992

This bulletin supersedes all other information regarding this procedure for Audi 100 with V6-engine.

Toothed belt, removing and installing

Removing
-

remove ribbed V-belt. see Repair Manual, Group 13

-

remove ribbed V-belt tensioner.

-

unclip ribbed V-belt guard on both sides.

-

turn crankshaft to TDC position by hand.
^

notch -A- must align with notch -B-.

-

check camshaft position.
^

large holes of locating plates on camshaft sprockets must point toward each other.

If NO

-

rotate crankshaft one revolution.

-

remove crankshaft position (CKP) sensor from left side of crankcase behind oil cooler (above oil pan).
^

TDC hole in crankshaft must be seen or felt behind hole for CKP.

Timing Belt - Removal and Installation Procedure|Page 703 > < Valve Clearance|Specifications|Page 698