Service station / air conditioner service station (this illustration shows V.A.G 1885 for example; for currently available air conditioner service stations, refer to → V.A.G workshop equipment catalogue) |
t
| The operations "testing, extraction (recycling), evacuation, flushing and charging" must be performed according to the relevant operating instructions. |
t
| The filters and dryers fitted must be renewed at the latest at the end of the period of use specified in the operating instructions and each time the station is drained (have replacement filter to hand). Available from equipment manufacturer; refer to the operating instructions for the air conditioner service station. |
t
| Currently available air conditioner service stations are provided with a refrigerant circuit flushing program. The scope of delivery of these air conditioner service stations also includes the necessary flushing attachment → V.A.G workshop equipment catalogue. |
Note t
| This air conditioner service station comprises the following standard components: Charging cylinder, pressure gauge set, vacuum pump, shut-off valves and filler hoses. |
t
| One quick-release coupling each (for service connections on high and low-pressure end) is included in the scope of delivery of this air conditioner service station. |
t
| Depending on the version, a current vacuum display (LED) may appear after pressing the „Evacuation“ button again. |
|
|
|