A3 L4-2.0L Turbo (BPY) (2006)
-
Unhook front of battery carrier from the air guide.
-
Install engine support bridge (10 - 222 A) onto fender bolting edge. The spindles are positioned forward.
-
Hook carabiner hooks of the spindles with shackles (10 - 222 A /12) into the engine lifting eyes.
-
Uniformly pre-load engine using both spindles, do not raise.
-
Remove bolts - arrows - from the engine assembly mounts one after the other, replace them (unless already done during engine installation) and
screw them in loosely.
-
Remove bolts - arrows - from the transmission assembly mounts one after the other, replace them (unless already done during engine installation)
and screw them in loosely.