Control Module: Testing and Inspection
Voltage Supply of Direct Shift Gearbox Mechatronic, Checking

Voltage Supply Of Direct Shift Gearbox Mechatronic, Checking

Special tools, testers and auxiliary items required

-

multimeter.

-

Wiring diagram.

Test requirements

-

The Direct Shift Gearbox (DSG) Mechatronic J743 fuses OK.

-

The Power Supply Relay (terminal 15) J329 OK.

-

Battery voltage at least 12.5 volts.

-

All electrical consumers such as, lights and rear window defroster, switched off.

-

Selector lever in "P" or "N".

-

A/C switched off. Ground (GND) connections between engine/transmission/chassis OK.

-

Ignition switched off.

Test procedure

-

Perform a preliminary check to verify the customers complaint.  See: Computers and Control Systems/Testing and Inspection/Scan Tool Testing
and Procedures/Preliminary Check

Start diagnosis

-

Disconnect the Direct Shift Gearbox (DSG) Mechatronic J743 electrical harness connector - 1 - by rotating counterclockwise.

Checking voltage supply, terminal 30

-

Using a multimeter, check the Direct Shift Gearbox (DSG) Mechatronic J743 electrical harness connector terminals for voltage.

-

Turn key on

Direct Shift Gearbox (DSG) Mechatronic J743 electrical harness connector terminals

11 to 19
11 to 16

Specified value: battery voltage.

If the specified value was not obtained:

-

Turn key off