Audi Workshop Service and Repair Manuals
HOME
FEATURES
MENU
INDEX
ABOUT US
Front sealing flange - exploded view >
< Removing and installing bracket for ancillaries
A3 Mk2
Power unit
4-cylinder direct petrol injection engine (2.0 ltr. 4-valve turbo), mechanics
Enginecrankshaft group, pistons / Cylinder block (pulley end)
Removing and installing vibration damper
Removing and installing vibration damper
Removing and installing vibration damper
Removing
l
Poly V-belt must be removed
→ Chapter
.
–
Remove centre noise insulation
-1 ... 3-
.
–
Remove noise insulation (right-side)
-fasteners 1 ... 3-
.
–
Remove vibration damper / pulley.
Note
To loosen and tighten the crankshaft pulley, counterhold central bolt with a ring spanner.
Installing
Installation is carried out in the reverse order; note the following:
l
Tightening torques
→ Chapter
–
Install the crankshaft pulley with genuine bolts only:
→ Parts catalogue
.
t
Assembly is only possible in one position: The hole
-arrow-
in the crankshaft pulley must fit over the projection on the toothed belt sprocket.
Power unit
4-cylinder direct petrol injection engine (2.0 ltr. 4-valve turbo), mechanics
Enginecrankshaft group, pistons / Cylinder block (pulley end)
Removing and installing vibration damper
Front sealing flange - exploded view >
< Removing and installing bracket for ancillaries