audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Charge air cooling > < Turbocharger - exploded view
Removing and installing turbocharger
Removing and installing turbocharger
Special tools and workshop equipment required
   
t  Hose clip pliers -VAS 6340-
Removing
  Note
Secure the heat insulation sleeve in the original position when installing.
–  Observe rules for cleanliness → Chapter.
  Caution
If the turbocharger has suffered mechanical damage (e.g. damaged compressor wheel), it is not sufficient merely to fit a new turbocharger. The following work must be performed in order to avoid further damage:
t  Check air cleaner housing, air filter element and air hoses for dirt and foreign particles.
t  Check the entire charge air system (including the charge air cooler) for foreign matter.
t  If foreign matter is found in the charge air system, clean all relevant ducts and hoses and renew charge air cooler if necessary.
–  Remove particulate filter → Chapter.
  W00-10380
–  Remove air cleaner housing → Rep. gr.23.
  A23-10236
–  Press release tabs and disconnect crankcase breather hose -1- from cylinder head cover.
–  Move clear vacuum hoses -arrows-.
–  Remove bolt -2-, swivel air pipe with connection to rear and detach from turbocharger.
  A21-10487
–  Detach heat shield sleeve.
–  Detach vacuum hose -2- from vacuum unit of turbocharger.
–  Disconnect vacuum hose -3-.
–  Unplug electrical connector -1- at position sender for charge pressure positioner -G581-.
  A21-10338
–  Move clear electrical connector -3- for exhaust gas temperature sender 1 -G235- and electrical wiring.
  Note
Disregard -items 1, 2-.
  A26-10696
–  Remove bolts -arrows-.
–  Loosen hose clip -1- and detach pulsation damper -2-.
  A21-10478
–  Remove bolts and detach exhaust gas recirculation pipes -A-.
  N15-10443
–  Remove bolts -1, 3-, union nut -2- and banjo bolts -4, 5- and detach support for turbocharger with oil supply line.
  A21-10502
–  Remove bolts -arrows- and detach heat shield.
  A21-10480
–  Remove nuts -arrows- and detach turbocharger with exhaust manifold from cylinder head.
Installing
Installation is carried out in the reverse order; note the following:
l  Tightening torques → Chapter „Turbocharger - exploded view“
  Note
t  Renew seals, gaskets, O-rings and self-locking nuts.
t  Fill turbocharger with engine oil at connection for oil supply line.
t  Hose connections and air pipes and hoses must be free of oil and grease before assembly.
t  Secure all hose connections with the correct type of hose clips (same as original equipment) → Electronic parts catalogue.
t  After installing the turbocharger, allow the engine to idle for approx. 1 minute without pressing the accelerator to ensure that the turbocharger is supplied with oil.
t  Fit heat insulation sleeves in the original positions when installing.
–  Install air hoses with screw-type clips → Fig..
–  Install exhaust gas recirculation pipes → Chapter.
–  Connect vacuum hoses → Chapter.
–  Electrical connections and routing → Current flow diagrams, Electrical fault finding and Fitting locations.
–  Install air cleaner housing → Rep. gr.23.
–  Install particulate filter → Chapter.
  A21-10481

Charge air cooling > < Turbocharger - exploded view