A3 Quattro V6-3.2L (BUB) (2008)
Installation is the reverse of removal, noting the following:
-
Replace O-rings seals - D - and - E -. Refer to=> [ Refrigerant Circuit O-Ring Seals ] See: Description and Operation/Refrigerant Circuit O-Ring
Seals, version.
-
Check fitted pin - G - (not installed at all connections) and sleeve - H - for damage and proper seating.
‹› Coat O-ring seals lightly with refrigerant oil before installing. Refer to => [ Refrigerant Circuit O-Ring Seals ] See: Description and
Operation/Refrigerant Circuit O-Ring Seals.
‹› Check the o-rings for proper seating within the groove - F - on the refrigerant line.
-
Following attachment, check routing of refrigerant pipes. They must be inserted in holders provided and not make contact with other components.
-
Evacuate and re-charge refrigerant circuit. Refrigerant R134a - Servicing
-
Operate the A/C system after filling the refrigerant circuit. Refer to=> [ A/C System, Operating after Filling Refrigerant Circuit ] See: Service and
Repair/Procedures/A/C System, Operating after Filling Refrigerant Circuit.
‹› Note the information regarding operating the A/C system after filling Refrigerant R134a - Servicing.