audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Air Injection Bypass Valve|Description and Operation|Page 3532 > < Air Injection Bypass Valve|Description and Operation
Page 2
background image

-

Remove the air duct hose - arrow - from the Throttle Valve Control Module (J338) and position aside.

-

Disconnect the Secondary Air Injection hose - arrow -. 

-

Inject a light air pressure into the in Secondary Air Injection hose to close the combination valve. (do not use compressed air).

‹› The combination valve should close and seal. Air should not be able to pass through the combination valve.

-

Operate the hand vacuum pump.

‹› The combination valve should open. Air should be able to pass through the combination valve.

Air Injection Bypass Valve|Description and Operation|Page 3532 > < Air Injection Bypass Valve|Description and Operation