If the specified value was not obtained:

-

Check the wiring connection from the Evaporative Emission (EVAP) Canister Purge Regulator Valve N80 electrical harness connector terminal 1
to the Motronic Engine Control Module (ECM) Power Supply Relay J271 terminal 2/87 for an open circuit according to wiring diagram.

If the specified value was not obtained:

-

Check the wiring for a short circuit to Battery positive (+) or an open circuit.

-

Check the electrical harness connector for damage, corrosion, lose or broken terminals.

-

If necessary, repair the wiring connection.

If the specified value was obtained:

Check Ground (GND) activation

-

Using a Multimeter, check the Evaporative Emission (EVAP) Canister Purge Regulator Valve N80 electrical harness connector to Battery positive
(+) for voltage.

Evaporative Emission (EVAP)

Measure to

Canister Purge Regulator Valve
N80 Electrical Harness connector
Terminal

2

Battery positive (+)

-

Operate the starter briefly.

Specified value: battery voltage.

-

Switch the ignition off.

If the specified value was not obtained:

If the manufacturers test box is being used. Perform the following step.

-

Install the test box.

If the manufacturers test box is not being used. Perform the following step.

-

Remove the Motronic Engine Control Module (ECM) J220.

Final procedures

After repair work, the following work steps must be performed in the mentioned sequence:

1. Check the DTC memory.
2. If necessary, erase the DTC memory.
3. If the DTC memory was erased, generate readiness code.

-

End diagnosis and switch the ignition off.