A4 V6-3.0L (AVK) (2004)
-
Unscrew wire connection -2-.
-
Remove bolts -1- and -3-.
-
Unclip the corresponding connector base.
NOTE:
Check the exact assignment for connection point E-Box plenum chamber in the current wiring diagram.
Installing
Installation is reverse of removal, paying attention to the following:
NOTE: All cable ties opened or cut during engine removal must be reinstalled at the same locations during installation.
Tightening torques
Connection point, E-Box plenum chamber to center tube for instrument panel: 3 Nm
Screw connections for electrical cables: 9 Nm