A4 V6-3.0L (AVK) (2004)
-
Remove cover for E-box, plenum chamber (arrows).
-
Pry off Engine Control Module (ECM) retaining bracket (arrows) using a screwdriver and set control module aside.
-
If installed, unclip Transmission Control Module (TCM) retaining bracket and set control module aside.
-
Connect test box to wiring harness of Engine Control Module (ECM); ECM is not connected. See: Computers and Control Systems/Testing and
Inspection/Reading and Clearing Diagnostic Trouble Codes/Scan Tool Connecting/With Generic Scan Tool/Text Box, Connecting For Wiring
Test
-
Using wires e.g. from connector test kit V.A.G 1594 A, bridge terminals 1 and 46 on test box.
-
Switch ignition on.
-
Secondary Air Injection (AIR) Pump Relay -3- (in E-box, plenum chamber) must engage and Secondary Air Injection (AIR) Pump Motor
-V101- must run
A - Secondary Air Injection (AIR) Pump Motor runs:
-
Check voltage supply of the Secondary Air Injection (AIR) pump relay.
-
Check activation of the Secondary Air Injection (AIR) pump relay.
B - Secondary Air Injection (AIR) Pump Motor does not run:
-
Check voltage supply of the Secondary Air Injection (AIR) pump motor.
Checking voltage supply of Secondary Air Injection (AIR) pump relay