audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Oil filter bracket, oil cooler > < Installing sump (top section) - engines with moulded gasket
Installing sump (top section) - engines with liquid gasket
Installing sump (top section) - engines with liquid gasket
Special tools and workshop equipment required
t  Electric drill with plastic brush attachment
t  Safety goggles
t  Sealant → Electronic parts catalogue
Procedure
Installation is carried out in the reverse order; note the following:
  Caution
Risk of leaks.
It is essential to use a liquid gasket again if sump (bottom section) was previously fitted with such a gasket.
  Note
Renew gaskets, seals and O-rings.
   
–  Remove remaining sealant on sump (top section) and cylinder block using rotating plastic brush or similar.
  WARNING
Protect eyes against injuries.
Wear safety goggles.
–  Clean sealing surfaces; they must be free of oil and grease.
  Note
The sump (top section) must be installed within 5 minutes after applying sealant.
  Note
  A17-0161
Note the use-by date of the sealant.
–  Cut off nozzle of tube at front marking (nozzle Ø approx. 3 mm).
  A17-0081
  Caution
Make sure lubrication system is not clogged by excess sealant.
The bead of sealant must not be thicker than specified.
–  Apply bead of sealant -arrows- onto clean sealing surface of sump (top section) as shown in illustration.
l  Thickness of sealant bead: 2 ... 3 mm.
  Note
t  Take particular care when applying sealant bead in area of sealing flange (gearbox end).
t  The sump (top section) must be installed within 5 minutes after applying the sealant.
–  When positioning sump (top section), insert dipstick guide tube in hole.
–  Fit sump (top section) and tighten all bolts securing sump (top section) to cylinder block initially to 5 Nm in diagonal sequence.
–  Tighten bolts securing sump (top section) to gearbox to 45 Nm.
  A17-0172
–  Tighten bolts -1- and -2- securing sump (top section) to cylinder block in diagonal sequence to 16 Nm.
–  Install subframe → Rep. Gr.40.
–  Install oil pump → Chapter.
–  Install sump (bottom section) → Chapter.
–  Install alternator and starter → Rep. Gr.27.
–  Install poly V-belt for power steering pump, alternator and viscous fan → Chapter.
  A17-0112
–  Allow stop for torque reaction support to rest on rubber buffer for torque reaction support and tighten bolts -arrows- to 28 Nm.
–  Fill up with engine oil and check engine oil level → Booklet802.
–  Fill up with coolant → Anchor.
–  Observe notes on procedures required after connecting battery → Rep. Gr.27.
Tightening torques
  A10-0767
ComponentNm
Sump (top section) to Cylinder block, sealing flanges16
Gearbox45
Balance shaft assembly to sump (top section)22
Torque reaction support to top section of sump45
Coolant drain pipe to sump10
Stop for torque reaction support to lock carrier25
Bracket for air conditioner compressor to:Sump (top section)22
Bracket for power steering pump and oil cooler22
Air conditioner compressor to bracket22

   

Oil filter bracket, oil cooler > < Installing sump (top section) - engines with moulded gasket