Testing intake manifold change-over function
Testing vacuum system for leaks
Special tools, testers and auxiliary items
-
◆ Remote control V.A.G 1348/3A with adapter cable V.A.G 1348/3-2
-
◆ Hand vacuum pump V.A.G 1390
-
◆ Adapter set V.A.G 1594
-
‒ Run engine at idling speed for 2 or 3 minutes to build up vacuum pressure.
-
‒ Switch off ignition.
-
‒ Unplug connector from intake manifold change-over valve -N156.
|