-
‒ → Insert vane pump -3- in bracket -2-.
-
‒ Screw in and tighten bolts -5- and -6-.
-
‒ Position bracket with vane pump on cylinder block.
-
‒ Screw in and tighten bolts -1- and -4-.
-
‒ Position suction pipe with hose on vane pump and fit new clamp.
-
‒ Mark -P- at suction hose must be aligned with seam at pump.
-
‒ Fit new sealing rings on banjo bolt.
-
‒ Tighten banjo bolt for pressure hose.
-
‒ Detach hose clamps -3094-.
-
‒ Install ignition coils with holder.
-
‒ Attach ignition cables to ignition coils.
=> MPFI Injection and Ignition System; Repair Group 28; Checking ignition system; Removing and installing ignition components
-
‒ Install vane pump pulley.
-
‒ Fit ribbed belt.
=> 6-cyl. Engine (2-valve), Mechanics; Repair Group 13; Dismantling and assembling engine
When installing belt, make sure it is properly seated in pulleys.
-
‒ Fit cover for ribbed belt.
-
‒ Fit top engine cover.
-
‒ Fill with hydraulic fluid G 002 000.
-
‒ Start engine and check belt running.
-
‒ Check hydraulic fluid level .
-
‒ Bleed steering system .
-
‒ Check steering system for leaks .
Tightening torques => Page 48-114
|