–
| Disconnect both coolant hoses -arrows-. |
–
| Remove bolts -1- and -2-. |
–
| Pull off front coolant pipe towards the front. |
Installation is carried out in the reverse order; note the following: |
Note t
| Secure all hose connections with the correct type of hose clips (same as original equipment) → Parts catalogue. |
–
| Before installing, clean and smoothen sealing surface for O-ring. |
–
| Lubricate new O-ring with “G12+” and slide onto coolant pipe. |
–
| Push front coolant pipe into coolant pipe (right-side) and into bore on cylinder block. |
–
| Install toothed belt (adjust valve timing) → Anchor. |
–
| Install poly V-belt for power steering pump, alternator and viscous fan. → Anchor |
–
| Dynamically check and adjust commencement of injection → Rep. Gr.23. |
|
|
|