Removing
  Note
All cable ties which are released or cut open when removing must be refitted in the same position when installing.
–  Pull off engine cover panel (rear) -arrows-.
  A10-1515
–  Pull non-return valve -1- off connection at air intake hose.
–  Remove air intake hose. To do so, release hose clip -2- and clamps -arrows-.
  A10-10124
–  Unplug electrical connector -2- for Lambda probe after catalytic converter -G130- and move wiring clear (downwards).
  Note
Disregard -item 1-.
  A24-10034
–  Unscrew nut -2- (accessible from above) connecting front exhaust pipe to exhaust manifold.
  Note
Shown from rear with engine removed for illustration purposes.
–  Remove front right wheel.
  A26-10067
–  Vehicles with auxiliary heater: remove bolts -arrows- securing exhaust pipe for auxiliary/additional heater to noise insulation.
  A10-0407
–  Open quick-release fasteners -1 … 3- and take off front and rear noise insulation.
  A10-1320
–  Unbolt heat shield -1- for drive shaft (right-side).
  A10-0961
–  Unscrew nuts -1- and -3- (accessible from below) connecting front exhaust pipe to exhaust manifold.
  Note
Shown in illustration with engine removed.
  A26-10067
–  Loosen clamps on exhaust system -arrows- and disconnect exhaust pipes.
  A26-0437
–  Apply lifting column of engine/gearbox jack -V.A.G 1383 A- centrally below cast lug on gearbox housing -arrow- and support gearbox from below.
  A37-10027
–  First remove bolts -2- and -3- and then subframe securing bolts -1- and -4-.
  A26-0441
–  Lower gearbox and subframe slowly using engine/gearbox jack -V.A.G 1383 A- until dimension -a- is reached.
l  Dimension -a- = 50 mm
  A10-10106
–  Remove bolt -1- on bracket (right-side) for front exhaust pipe.
  Note
Disregard -item 2-.
–  Remove front exhaust pipe with catalytic converter.
Installing
Installation is carried out in the reverse order; note the following:
  Note
t  Renew gaskets, O-ring and self-locking nuts.
t  Secure all hose connections with the correct type of hose clips (same as original equipment) → Electronic parts catalogue.
t  Fit all cable ties in the original positions when installing.
t  When installing, the Lambda probe wire must always be reattached at the same locations to prevent it from coming into contact with the exhaust pipe.
–  Install subframe → Rep. Gr.40.
–  Align exhaust system so it is free of stress → Chapter.
  Note
Mounting components for exhaust system → Fig..
Tightening torques
  A26-10145
ComponentNm
Front exhaust pipe with catalytic converter to exhaust manifold27 1)2)
Mounting plate to front exhaust pipe25
Drive shaft heat shield to gearbox25
Hose clips (9 mm wide)3
l  1) Renew nuts.
l  2) Grease with high-temperature paste; refer to → Electronic parts catalogue for high-temperature paste

   