audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Removing and installing coolant pump > < Coolant pump, thermostat, pump for exhaust gas recirculation coolerV400
Coolant pump and thermostat - exploded view
   
Coolant pump and thermostat - exploded view
Vehicles without SCR catalytic converter
1 - Bolt
q   23 Nm
2 - Bolt
q   9 Nm
3 - Coolant hose
q   To radiator (bottom right)
4 - Hose connection with thermostat
q   Removing and installing → Chapter
5 - Seal
q   Renew
6 - Coolant pump
q   Removing and installing → Chapter
7 - Bolt
q   Tightening torque and sequence → Fig.
8 - Poly V-belt pulley for coolant pump
q   Installation position: marking „vorne“ (front) faces in direction of travel

   
Vehicles with SCR catalytic converter
1 - Hose connection with thermostat
q   Removing and installing → Chapter
2 - Coolant hose
q   From radiator (bottom right)
3 - Bolt
q   9 Nm
4 - Coolant hose
q   To coolant pipe (top left)
5 - Coolant hose
q   From pump for exhaust gas recirculation cooler -V400-
6 - Connection with thermostat for exhaust gas recirculation
q   Removing and installing → Chapter
7 - O-ring
q   Renew
8 - Seal
q   Renew
9 - Bolt
q   9 Nm
10 - Coolant pump
q   Removing and installing → Chapter
11 - Bolt
q   Tightening torque and sequence → Fig.
12 - Poly V-belt pulley for coolant pump
q   Installation position: marking „vorne“ (front) faces in direction of travel
13 - Bolt
q   23 Nm

   
Coolant pump - tightening torque and sequence
–  Tighten bolts -arrow- for coolant pump in diagonal sequence and in stages to 9 Nm.
  A19-10018

Removing and installing coolant pump > < Coolant pump, thermostat, pump for exhaust gas recirculation coolerV400