audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Canister Purge Control Valve|Testing and Inspection|Page 3701 > < Canister Purge Control Valve|Testing and Inspection|Page 3699
Page 3
background image

-

Install the test box. Refer to Fuel Injection and Ignition Repair Information.

If the manufacturers test box is not being used. Perform the following step.

-

Remove the Engine Control Module (ECM) (J623). Refer to => [ Engine Control Module, Replacing ] See: Computers and Control
Systems/Engine Control Module/Service and Repair.

-

Using a Multimeter, check the Evaporative Emission (EVAP) Canister Purge Regulator Valve (N80) electrical harness connector terminal 2 to
Engine Control Module (ECM) (J623) electrical harness connector T60 terminal 5 for resistance. 

Specified value: 1.5 ohms max.

If the specification is not obtained:

-

Check the wiring for an open circuit, short circuit to each other, Battery (+), and Ground (GND).

-

Check the electrical harness connector for damage, corrosion, loose or broken terminals.

-

If necessary, repair the wiring connection.

If the specification was obtained:

-

Erase the DTC memory. Refer to => [ Diagnostic Mode 04 - Erase DTC Memory ] See: Computers and Control Systems/Testing and
Inspection/Scan Tool Testing and Procedures/Diagnostic Modes/Diagnostic Mode 04 - Erase DTC Memory.

-

Perform a road test to verify repair.

If the DTC does not return:

Repair complete, Generate readiness code. Refer to => [ Readiness Code ] See: Computers and Control Systems/Testing and Inspection/Monitors,
Trips, Drive Cycles and Readiness Codes. 

-

End diagnosis.

If the DTC does return and no malfunction is detected in the wiring and the voltage supply was OK:

-

Replace the Engine Control Module (ECM) (J623 ). Refer to => [ Engine Control Module, Replacing ] See: Computers and Control
Systems/Engine Control Module/Service and Repair.

-

Assembly is performed in the reverse of the removal.

Final procedures

Canister Purge Control Valve|Testing and Inspection|Page 3701 > < Canister Purge Control Valve|Testing and Inspection|Page 3699