audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Leak Detection Pump, Evaporative System|Testing and Inspection|Page 4100 > < Leak Detection Pump, Evaporative System|Testing and Inspection|Page 4098
Page 3
background image

-

Using a multimeter, check the Leak Detection Pump (LDP) (-V144-)electrical harness connector terminal 3 to the Motronic Engine Control
Module (ECM) Power Supply Relay (J271 ) terminal 8 for an open circuit.

Specified value: Wire resistance max 1.5 ohms.

If the specification is not obtained:

-

Check the wiring for a short circuit to Battery positive (+) or an open circuit.

-

Check the electrical harness connector for damage, corrosion, loose or broken terminals.

-

If necessary, repair the faulty wiring connection.

If no malfunction is detected in the wiring and if the voltage supply was OK:

Checking wiring

If the manufacturers test box is being used, perform the following step.

-

Install the test box.

If the manufacturers test box is not being used, perform the following step.

-

Remove the Motronic Engine Control Module (ECM) ( J623).

-

Using a multimeter, check the Leak Detection Pump (LDP) (-V144-) electrical connector terminal 1 to Motronic Engine Control Module (ECM)
(J623) electrical connector T94 terminal 44 for an open circuit.

-

Using a multimeter, check the Leak Detection Pump (LDP) (-V144-) electrical connector terminal 2 to Motronic Engine Control Module (ECM)
(J623) electrical connector T94 terminal 49 for an open circuit.

Leak Detection Pump, Evaporative System|Testing and Inspection|Page 4100 > < Leak Detection Pump, Evaporative System|Testing and Inspection|Page 4098