Shifter A/T: Testing and Inspection

Selector Lever Voltage Supply, Checking

Special tools, testers and auxiliary items required

‹› multimeter.

‹› Wiring diagram.

Test requirements

‹› The Direct Shift Gearbox (DSG) Mechatronic (J743 ) fuses OK.

‹› Battery voltage at least 12.5 volts.

‹› All electrical consumers such as, lights and rear window defroster, switched off.

‹› Selector lever in "P".

‹› A/C switched off.

‹› Ground (GND) connections between engine/transmission/chassis OK.

‹› Ignition switched off.

Test procedure

-

Perform a preliminary check to verify the customers complaint. Refer to => [ Preliminary Check ] See: Powertrain Management/Computers and
Control Systems/Testing and Inspection/Scan Tool Testing and Procedures/Preliminary Check

Start diagnosis

-

Remove the selector mechanism, far enough to gain access to the Selector Lever (E313) electrical harness connector -  A -.

-

Disconnect the Selector Lever (E313) electrical harness connector - A -.