audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Driveshaft Assembly Overview|Page 5932 > < Driveshaft Assembly Overview|Page 5930
Page 2
background image

-

If one of these markings is no longer visible (for example -  arrow A - on the driveshaft), then mark the missing point in color.

‹› The marking on the driveshaft - arrow A - and on the rear final drive - arrow B - are on one line.

-

Remove mounting bolts - 1 - (quantity: 6) on the rear CV joint.

-

Use the Counterhold Tool (T10172) with the Adapters (T10172/5) to do this.

-

Remove the driveshaft from the rear final drive and secure it to the side of the subframe.

Install the driveshaft to the rear final drive.

Installation is in the reverse order of removal. Pay attention to the following:

‹› Remove the old, dry High-Temperature Grease from the CV joint and the driveshaft flange. Fill with the exact same amount of new High

Temperature Grease (G 000 633).

‹› The threads in the flange shaft rear final drive must be cleaned of locking fluid residue. Cleaning can be performed with a thread tap. Otherwise,

the securing bolts can shear while screwing in.

‹› After removal of the driveshaft from the rear final drive, do not reinstall additional balance washer (thicker washer) that may be between washer

and bolt head.

‹› Always replace securing bolts for driveshaft (self-locking bolts). 

-

Check the driveshaft seal on the rear final drive flange for damage and replace if damaged.

-

Install driveshaft and fit bolts for CV joints.

-

Make sure that the markings on the driveshaft flange - arrow A - and the rear final drive - arrow B - are aligned. 

Driveshaft Assembly Overview|Page 5932 > < Driveshaft Assembly Overview|Page 5930