audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Accumulator HVAC|Service and Repair|Page 7804 > < Tools and Equipment|Page 7799
Page 1
background image

Accumulator HVAC: Service and Repair

Accumulator, Removing And Installing

Removing

-

Discharge A/C refrigerant system

-

Remove complete front bumper:

-

Move the lock carrier into service position:

-

Remove charge air cooler or the secondary air injection pump.

-

Remove bolts -A- and remove refrigerant lines -B-and -C-.

-

Unscrew bolts -A-.

-

Loosen notch on bracket for accumulator -B-from body

-

Remove accumulator with bracket.

-

Loosen screw -C-and remove accumulator from bracket -D-.

NOTE:

-

Seal all open connections.

-

The connection of the refrigerant lines differs, depending on engine type:

-

Keep accumulator closed as long as possible; do not remove caps until just before installing. The accumulator contains a desiccant which will
become saturated with moisture in a short time if accumulator is left open. This makes the accumulator unusable.

Installing

Installation is reverse of removal, noting the following:

NOTE:

Accumulator HVAC|Service and Repair|Page 7804 > < Tools and Equipment|Page 7799