audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Air Bypass Valve Solenoid, Turbocharger|Testing and Inspection|Page 6963 > < How to Find Wiring Diagrams|Page 6957
Page 1
background image

Air Bypass Valve Solenoid: Testing and Inspection

Turbocharger Recirculating Valve N249, Checking

Special tools, testers and auxiliary items required

-

Multimeter V.A.G 1526 or equivalent.

-

Test Box 105 Pin VAG1598/42.

-

Adapter Lead Vag1598/39 VAG1598/39.

-

Adapter cable V.A.G 1598/39-1.

NOTE:  Use only gold-plated terminals when servicing terminals in harness connector of Charge Air Pressure Sensor G31.

Test requirements

-

Fuses for the Engine Control Module (ECM) J623 OK.

-

Battery voltage at least 12.5 volts.

-

All electrical consumers such as, lights and rear window defroster, switched off.

-

On vehicles with automatic transmission, selector lever in position "P" or "N".

-

A/C switched off.

-

Ground (GND) connections between engine/transmission/chassis OK.

-

Ignition switched off.

Test sequence

-

Remove engine cover - arrows - .

-

Disconnect the electrical harness connector - 3 - from the Turbocharger Recirculating Valve N249.

Air Bypass Valve Solenoid, Turbocharger|Testing and Inspection|Page 6963 > < How to Find Wiring Diagrams|Page 6957