audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Removal and Replacement|Page 10426 > < Removal and Replacement|Page 10424
Page 6
background image

A Supply hose from cylinder head
B Return hose to water pump

-

Reinstall the removed components in reverse order of removal except the driver side storage compartment.

-

Bleed coolant circuit.

‹› The heat exchanger must be additionally bled by the arrangement of the coolant pipes to the heat exchanger of the A/C unit. Proceed as follows: 

‹› - Bleed the coolant circuit.

‹› - Switch the ignition off.

‹› - Carefully open the coolant reservoir cap (observe safety cautions when opening the cap).

‹› Release the clamp on coolant hose - B -.

‹› Push hose - B - back until the bore in the hose is no longer closed by the pipe.

‹› Increase the pressure in the coolant circuit e.g. using the hand pump of the cooling system tester (V.A.G 1274/) 

‹› Bleed the heat exchanger via hose - B - until the coolant is bubble-free.

‹› Connect coolant hose - B - and secure it with the clamp. 

‹› If necessary add coolant.

-

Check coolant circuit for leaks, pay particular attention between coolant hoses and heater core.

Removal and Replacement|Page 10426 > < Removal and Replacement|Page 10424