A6 V6-3.0L (AVK) (2004)
4
-
Operating rod
-
Adjust operating rod so that there is no tension or play
-
For installation to be correct, tailgate lock must lock in second stage (main lock)
5
-
Nuts
-
8 Nm (71 in.lb)
6
-
Handle mechanism
Removing:
-
Remove tailgate trim.
-
Unclip operating rod - 4 - from handle mechanism.
-
Remove nuts - 5 - and remove handle mechanism.