A8 Quattro Sedan V8-4.2L (BGK) (2006)
Air Injection Vacuum Control Solenoid Valve: Testing and Inspection
Secondary Air Injection Solenoid Valve, Checking
Intake Manifold Change-Over Valve, Testing
-
Disconnect connector from Secondary Air Injection (AIR) Solenoid Valve (N112).
-
Perform a resistance measurement between terminals on valve using portable multimeter (VAG1526).
Specified value: 25 to 35 ohms
If specified value is not obtained.
-
Replace Secondary Air Injection (AIR) Solenoid Valve (N112).
If specified value is obtained.
-
Check voltage supply.
Voltage Supply, Checking
-
Connect voltage test lamp (VAG1527) between connector terminal 2 and engine Ground (GND) using adapter cables from connector test kit
(VAG1594).