audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Leak Detection Pump, Checking|Page 7802 > < Leak Detection Pump, Checking|Page 7800
Page 3
background image

-

Operate starter briefly.

Specified value: approx. battery voltage

-

Switch ignition off.

If the specified values are not reached, check wire connection.

Wire Connections, Checking 

-

Connect test box (VAG1598/31) to harness connectors of wiring harness (do not connect ECM). Connect Ground (GND) clip at test box (not
visible in illustration) to Ground (GND), refer to Repair Manual.

-

Check the following wire connection for open circuit and short circuit to Ground (GND) and B+:

Leak Detection Pump, Checking|Page 7802 > < Leak Detection Pump, Checking|Page 7800