audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Intake Manifold and Injectors, with Magnesium Manifold|Page 4695 > < Intake Manifold and Injectors, with Magnesium Manifold|Page 4693
Page 8
background image

-

Make sure the high pressure lines are seated free of stress.

-

To tighten the 14 mm diameter union nut on the high pressure lines, use the (VAG 1331) with the (VAG 1331/8).

-

To tighten the 17 mm diameter union nut on the high pressure lines, use the (VAG 1331) with the (VAG 1331/6).

-

Only install the retaining tabs after the high pressure lines have been tightened.

-

Observe the safety precautions after connecting the battery.

-

If necessary, fill the cooling system.

Fuel Injectors

Special tools, testers and auxiliary items required

‹› Torque wrench (5-50 Nm) (VAG 1331)

‹› Tool insert, AF 17 (VAG 1331/6)

‹› Socket insert AF 14 (VAG 1331/8)

‹› Tool set (T10133)

Removing

CAUTION!
‹› Fuel system is under high pressure! Before opening the high pressure components of the fuel injection system, the pressure must be

Intake Manifold and Injectors, with Magnesium Manifold|Page 4695 > < Intake Manifold and Injectors, with Magnesium Manifold|Page 4693