A8L V8-4.2L (BFM) (2004)
-
Switch on heat gun and heat thread for approx. 20 to 25 seconds.
-
Grab bolt head - 2 - with locking pliers - 1 - and turn shear bolt in direction of - arrow -.
The procedure for the second shear bolt is exactly the same. Be especially careful, because the control module connectors are located in the immediate
vicinity.
-
Guide air gun nozzle - 1 - against locking mechanism thread so that the nozzle "encloses" the thread. Let nozzle make contact steadily on upper
end of protective housing.
-
Switch on heat gun and heat thread for approx. 20 to 25 seconds.