audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Heating and A/C Unit Heat Exchangers, Removing and Installing|Page 14748 > < Heating and A/C Unit Heat Exchangers, Removing and Installing|Page 14746
Page 2
background image

-

Before installing glove compartment and plenum chamber cover, check position of grommets -C- and -D- in coolant pipe penetration to plenum
chamber.

-

Before installing glove compartment, check cooling system for leaks.

-

Perform remaining installation operations in the same manner as that described for installation of heat exchanger on front passenger's side.

Heating and A/C Unit Heat Exchangers, Removing and Installing|Page 14748 > < Heating and A/C Unit Heat Exchangers, Removing and Installing|Page 14746