Allroad Quattro V6-2.7L Turbo (APB) (2002)
7
-
Locating pin
-
For securing door lock in "zero" position (only installed on replacement part)
-
After installing door lock and installing operating rod - 8 -, remove locating pin.
8
-
Operating rod
-
To remove door lock, disengage operating rod from fulcrum lever - 3 -.
9
-
Operating rod (door lock)