Allroad Quattro V6-2.7L Turbo (APB) (2002)
-
Unplug connectors from injectors -2- (cylinder bank 1..3).
-
Pull off hose -5- going to turbocharger intake side.
-
Unclip solenoid valve for charge pressure control -1-.
-
Pull connector off EVAP valve -2-.
-
Remove pressure pipes -1-.
Note: Watch position of retaining strips -2-.