Allroad Quattro V6-2.7L Turbo (APB) (2002)
-
M10 x20: 70 Nm
8. Triple roller connection
-
Chamfer (arrow) faces splines of drive axle
-
Installation position; Refer to Triple Roller joint.
9. Snap ring
-
Always replace
-
insert in groove on shaft
10. Sealing ring
-
There is a new seal in the repair kit; must be replaced.
11. Cover
-
Always replace
-
Destroyed during removal.
-
A modified cover is provided in the repair kit.
12. Clamp
-
Always replace
-
Tightening, Refer to Fig. 1
-
There may be different clamps, depending on construction. Also, mountable using 3340 pliers.
13. Boot for triple roller joint
14. Clamp
-
Always replace
-
Tightening, Refer to Fig. 1
15. Dished washer
-
Installation position, Refer to Fig. 4
16. Spacer ring (plastic)
-
Installation position, Refer to Fig. 4
17. Snap ring
-
Always replace
-
Insert in ring groove of shaft before installation (not visible on installed joint)
18. Outer CV joint
-
Replace only as complete unit
-
press off, Refer to Fig. 2
-
Installing:
-
Use plastic hammer to pound joint onto shaft until snap ring snaps in.
-
Lubricating
The instructions for Fig. 1 apply only to stainless steel tensioning clamps!
Rubber CV boot are clamped on with VAG1275 pliers.
Fig. 1 Tension the clamp on outer joint
-
Apply VAG1682 CV boot clamping pliers as shown in figure. Be sure that edges of clamping pliers are seated in corners (arrows B) of hose
clamp.
-
Tighten hose clamp by turning spindle with a torque wrench (do not tilt clamping pliers).
Note:
-
Tightening torque: 20 Nm.
-
Use torque wrench with adjustment range from 5 to 50 Nm (e.g. VAG1331).
-
Be sure thread of spindle in clamping pliers moves freely. Grease with MOS 2 grease, if necessary.
-
If it does not move freely, e.g. due to dirt in thread, the required clamp tension will not be achieved at the specified torque.