Allroad Quattro V8-4.2L (BAS) (2004)
Clamp subframe in vise only with protective pads!
Pull In rear bonded rubber bushings
^
To press in bonded rubber bushings use G 294 421 Al installation lubricant
^
Pull in bushing -A- until 3372/1 thrust piece is flush with upper edge of 3372 installation device.
^
Remove 3372 installation device and 3372/2 split bushings upward.
Pull in rear bonded rubber bushings
^
Insert 3372/2 split bushings between 3351/4 bridge and subframe.
^
Pull in bushing until it stops.
If paint on surface of unit should be damaged, the surface should be protected against corrosion.
Pull in front bonded rubber bushings
^
To press in bonded rubber bushings use G 294 421 Al installation lubricant
^
Insert 3372/2 split bushings in 3372 installation device, Fig. A40-0092
^
Pull in bushing -A- until 337211 thrust piece is flush with upper edge of 3372 installation device.