R8 Quattro Coupe V10-5.2L (BUJ) (2010)
-
Tighten the bolts - B and D -.
-
Evacuate and fill refrigerant circuit.
-
Check the refrigerant line connection points for leaks, e.g. using an electronic leak detector.
-
Install the A/C unit, refer to => [ A/C Unit ] See: Housing Assembly HVAC/Service and Repair/Removal and Replacement.
After finishing the repairs, perform the following work on the Climatronic Control Module (J255) using the Vehicle diagnosis, testing and information
system VAS 5051/ in the "Guided Fault Finding" function:
-
Check the DTC memory and erase any malfunctions shown.
-
Operate the A/C system after filling the refrigerant circuit, refer to => [ Operating After Filling Refrigerant Circuit ] See: Service
Precautions/Technician Safety Information/Heating, Ventilation & Air Conditioning.
‹› Note the information regarding operating the A/C system after filling.