R8 Quattro Coupe V10-5.2L (BUJ) (2010)
-
Tighten the bolts - 1 and 2 -.
‹› Tightening specification: 25 Nm.
-
Evacuate and fill refrigerant circuit.
-
Install the thermostat housing.
-
Fill with coolant.
After finishing the repairs, perform the following work on the Climatronic Control Module (J255) using the Vehicle diagnosis, testing and information
system VAS 5051/ in the "Guided Fault Finding" function:
-
Check the DTC memory and erase any malfunctions shown.
-
Operate the A/C system after filling the refrigerant circuit, refer to => [ Operating After Filling Refrigerant Circuit ] See: Heating and Air
Conditioning/Service Precautions/Technician Safety Information/Heating, Ventilation & Air Conditioning.
‹› Note the information regarding operating the A/C system after filling.