R8 Quattro Coupe V10-5.2L (BUJ) (2010)
-
Replace the O-ring - 4 -.
-
Install the service line - 2 - and secure the wire - 6 - with cable ties - 3 -.
-
Install the service line into each connection.
-
Tighten the bolts - 1 and 5 -.
‹› Tightening specification: 9 Nm.
-
Install refrigerant lines on the A/C compressor, refer to => [ Refrigerant Lines, Disconnecting from Compressor and Connecting ].
-
Evacuate and fill refrigerant circuit.
After finishing the repairs, perform the following work on the Climatronic Control Module (J255) using Vehicle diagnosis, testing and information
system VAS 5051/ in the "Guided Fault Finding" function:
-
Check the DTC memory and erase any malfunctions shown.
-
Operate the A/C system after filling the refrigerant circuit, refer to => [ Operating After Filling Refrigerant Circuit ] See: Heating and Air
Conditioning/Service Precautions/Technician Safety Information/Heating, Ventilation & Air Conditioning.
‹› Note the information regarding operating the A/C system after filling.