audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

A/C Unit and Refrigerant Lines|Page 1169 > < A/C Unit and Refrigerant Lines|Page 1167
Page 10
background image

1

Screw

‹› Tightening specification 25 Nm.

2

Refrigerant Line

‹› From the reservoir to the A/C compressor.

3

O-ring Seal

‹› Replace.

‹› Lubricate lightly with refrigerant oil before installing.

4

A/C Compressor

‹› V8 engine, removing and installing, refer to => [ Compressor ] See: Heating and Air Conditioning/Compressor HVAC/Service and

Repair/Compressors. Vehicles with V10 engine, refer to => [ Compressor ] See: Heating and Air Conditioning/Compressor HVAC/Service
and Repair/Compressors.

5

Refrigerant Line

‹› From the A/C compressor to condenser 1 (left).

‹› With a branch to the high pressure side service connection.

6

Screw

‹› Tightening specification 22 Nm.

A/C Unit and Refrigerant Lines|Page 1169 > < A/C Unit and Refrigerant Lines|Page 1167