R8 Quattro Coupe V10-5.2L (BUJ) (2010)
Installing
‹› Tightening specifications, refer to => [ Front Relay Carrier and Fuse Panel Assembly Overview ] See: Relay Box/Service and Repair/Front Relay
Carrier and Fuse Panel Assembly Overview and => [ Electrical wire to right A-pillar
fuse panel, tightening specifications ] See: Relay Box/Service and Repair/Front Relay Carrier and Fuse Panel Assembly Overview
Install in reverse order of removal, observing the following:
-
Install the right A-pillar trim.
-
Install the glove compartment.
-
Connect battery. Required actions => [ Connecting ] See: Starting and Charging/Tools and Equipment/Battery, Disconnecting and Connecting.