R8 Quattro Coupe V10-5.2L (BUJ) (2010)
-
Guide the wiring harness through the opening in the center tunnel and press the grommets - 3 - on.
-
Connect the electrical connectors
1. Heating control valve unit
2. Coolant pump (V50)
-
Install the driveshaft.
-
Install the center tunnel cover.
-
Install the parking brake lever.
-
Install the center console.
-
Check the DTC memory and erase any malfunctions displayed.
A005R800721-031810