audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Radiator|Page 2849 > < Radiator|Page 2847
Page 6
background image

-

Tilt radiator at upper edge forward, pull up and remove.

Installing

Installation is in reverse order of removal, note the following:

-

Remove old O-ring - 2 - in the coolant hose -  3 -.

-

Coat new O-ring with coolant and install it in the coolant hose. 

-

Press the coolant hose onto the radiator - 1 - until it engages audibly.

-

Press the coolant hose on again and pull to make sure the connection is engaged correctly.

-

Install bumper impact absorber.

-

Install the front bumper cover.

-

Fill with coolant => [ Filling ] See: Service and Repair/Procedures.

‹› Complete coolant must be replaced if the radiator was replaced.

Tightening Specifications

Radiator|Page 2849 > < Radiator|Page 2847