RS 4 Quattro Cabriolet V8-4.2L (BNS) (2008)
-
Remove bolts -1- and -3-.
-
Unclip the corresponding connector base.
NOTE: Check the exact assignment for connection point E-Box plenum chamber in the current wiring diagram.
Installing
Installation is reverse of removal, paying attention to the following:
NOTE: All cable ties opened or cut during engine removal must be reinstalled at the same locations during installation.
Tightening torques
Component
Nm
Connection point, E-Box plenum chamber 3 Nm
to center tube for instrument panel
Screw connections for electrical cables
9 Nm