RS 4 Quattro Cabriolet V8-4.2L (BNS) (2008)
-
Pull out flange shaft.
-
Pry out flange shaft oil seals using a suitable lever.
Installing
Installation is carried out in reverse order. Note the following:
-
Pack space between sealing and dust lips half full with sealing grease (G 052 128 A1.).
-
Lightly oil outer circumference of seal.
-
Drive new seal in onto stop, for this purpose do not cant seal.
-
Insert flange shaft.
-
Fasten flange shaft with cone head bolt.
-
Top off gear oil in rear final drive and check oil level. Refer to => [ Checking Rear Final Drive Gear Oil Level ] See: Final Drive Fluid/Service
and Repair/Rear Final Drive 01R (01AA,01EA,02XA,0A3A,01V,01VA,09LA Transmission).
-
Attach drive axles.
-
Attach heat shields to final drive - arrows -.