RS 6 V8-4.2L Turbo (BCY) (2003)
^
Installation position: vent valve (arrow) faces upward
-
Install thermostat housing.
Remaining installation steps are carried out in reverse sequence - note following points:
-
Install toothed belt (adjust valve timing).
-
Install lock carrier with attachments.
-
Install front bumper:
-
Install air filter housing.
-
Fill up with coolant.
-
Adjust headlights:
Tightening torques